Company News

DBFO 1 Project 3 M2 Junction 3 to 4
DBFO 1 WCSB from Bridge 012

In June 2008 a joint venture between Extrudakerb and their Irish partner Highway Barrier Solutions, was awarded by the principle contractor, HMC Joint Venture, a £2.2m sub contract to design and build a central reserve concrete barrier, retaining wall and associated linear insitu concrete drainage system. Extrudakerb / HBS partnership have integrated within the HMC […]